
C · Construction
Building Line-out & Column Marking in Jhalawar & Kota region
नींव से पहले सही मार्किंग — कॉलम एक इंच भी इधर-उधर नहीं
A small mistake in marking becomes a big mistake in concrete. We transfer the architect's drawing to the ground — centre lines, column positions and levels — with a Total Station, so the building comes up exactly as designed.
When do you need this?
- Before excavation — mark the foundation outline correctly.
- Column positions — every column at its exact grid point.
- Multi-storey work — check verticality and transfer lines upward.
- Boundary setbacks — keep the building inside the permitted line.
- Commercial sites — large grids marked fast and accurately.
What you receive
Centre-line & column marks
pegs and paint on site
Level pegs
reference levels for plinth and floors
Marking check sheet
points marked with coordinates
Re-check visits
on request during construction
How it works
- 1Call / WhatsApp
Share the location pin, khasra number, area and purpose of the survey.
- 2Quote & date
We suggest the right method, share the cost and fix a site date.
- 3Field survey
Our team measures on site with Total Station / DGPS and marks the points.
- 4Map & report
AutoCAD map, PDF, printed copy and KML on WhatsApp or email.
Questions about this service
What drawing do you need?
Can the mistri do this with a tape?
Do you check the plot boundary first?
Contact us
Get a free survey quote
Call, WhatsApp or visit the office — we reply the same working day.
- Phone / WhatsApp079760 27294
- HoursMonday to Saturday, 10:00 AM – 6:00 PM. Sunday closed.